Loading episode...

S36:E15 - Lexington Project 2015: Part 7: Inspections

Lexington Project 2015: Part 7: Inspections

S36:E15
2015 IMDb

Rough mechanical and rough framing inspections are discussed; reinforced fiberglass columns to support the farmer's porch are installed; how an arched doorway is being turned into one that's squared off; and the storm window system being using to enclose the screen porch is spotlighted.

Episodes